Design of Brebex BESS – 80MW/160MWh - Serbia
Project Type
High Voltage Design
Date
2024
Brebex 80MW BESS is one of the FIRST large-scale Battery Energy Storage Projects to be deployed in Serbia.
Valen Power Engineering were contracted by Future Energy Systems to provide Electrical Design expertise to produce FEED Design deliverables and conduct a review of the Final Submission for the FIRST Large Scale BESS Project in Serbia. The Battery Energy Storage System is required to be co-located with an 80MW Windfarm and 300MW Synchronous Power Plant to balance fluctuations in the generation from the Windfarm to meet the requirements of Serbia’s Grid Code
Design Deliverables
Concept layout drawing based on the most modern commercially available BESS Systems
Single Line and Key Line Diagrams showing Primary Plant and Protection configurations
Preliminary Communications Topology Diagrams
Preliminary Auxiliary Transformer sizing calculations, LVAC Cable sizing calculations and DC Cable sizing calculations
Selection of suitable MV, LVAC and DC Cables
Key Facts
First large-scale BESS Project in Serbia
Utilisation of Valen Power Engineering Ltd’s extensive BESS experience to develop a ‘Concept Design’ to maximize capacity in a highly constrained physical space
Design demonstrated compliance with TNO, Regulatory and Employer's requirements
Project now at Detailed Design Stage and awaiting start of construction